Construction of a stormwater utility line along West 7th Street between Myrtle Street and Snipes Street in The Dalles will start Thursday and continue through March 29. The road will be operational as a lane shift has been approved to ensure the flow of traffic is maintained. Construction hours are anticipated from 7 a.m. to 5 p.m. Please use alternate routes, if able, or use caution while navigating this area to ensure the safety of everyone involved.