Crack sealing of asphalt on three sections of street in The Dalles is scheduled for next week. Work will take place Monday through Friday beginning at 7 a.m. each morning. Streets scheduled for the work include West Scenic Drive between Garrison and West 20th, Old Dufur Road between Lambert and Fremont, and Lone Pine Boulevard from Highway 197 to Lone Pine Drive. No park signs will be placed on the curb at least 48 hours ahead of scheduled work. Motorists are asked to watch for the crews and avoid driving on rubberized asphalt crack seal until it is set. These crack seal projects will require short duration lane closures between 7:00 a.m. and 5:00 p.m. at each location. The Dalles Public Works has posted a list of streets that will be crack sealed at thedalles.org/summerstreetmaintenance.