The Oregon Department of Transportation will start a project in Cascade Locks in May that will include paving Wa Na Pa Street from just east of the Bridge of the Gods to Forest Lane, constructing accessible sidewalk curb ramps at 11 intersections, and restriping the roadway and six crosswalks. One lane of traffic in each direction will be open during sidewalk curb ramp work. Flaggers may need to direct traffic on weekdays during paving. Access that is accessible for people walking, and biking will be available in the parking lanes on Wa Na Pa. On-street parking will be closed in segments during construction. Short-term detours may be in place for side streets at their intersection with Wa Na Pa. Work will take place between 7 a.m. and 10 p.m. on weekends prior to Memorial Day and weekdays throughout construction. Those working or living in the area may hear the noise. A 24/7 noise hotline is available for noise questions or comments at 503-294-1337. The contractor plans to start work between Forest Lane and SW Portage Road as soon as Monday.