The Port of Hood River says live load testing crews have completed their work on the Hood River-White Salmon Interstate Bridge ahead of schedule. All planned closures for the remainder of the week have been cancelled. The work had required full bridge closures that snarled traffic on October 13 and on Monday. The load tests were being done to determine what kind of maintenance would be needed to bring weight limits on the bridge back up to where they were before the Oregon Department of Transportation required a decrease earlier in the year. No results are available at this point.