Hood River County Chip Seal Program Starts Monday

Hood River County’s 2024 Chip Seal Program construction is set to begin on Monday.  Frankton Road, Indian Creek Road, and Barrett Drive will receive a single layer chip seal, while Belmont Drive from Fairview to Country Club and Country Club from Barrett to Portland Drive will receive a double seal.  The chip seal work will reduce traffic to single lanes while construction crews are present.  Flaggers will be used to route traffic as needed to keep traffic flowing.  Some loose gravel may remain on the road for several days while the asphalt hardens.  To minimize potential damage to the chip seal and reduce the risk of loose gravel being thrown by tires, lower speed limits may be imposed temporarily, and bicyclists are advised to avoid those roads while loose rock is present.  Construction should be completed by June 28, unless there are weather-related delays.  Finish work will take place in July, then roads will be restriped.  Residents and businesses within the construction zones will have access, although there may be intermittent delays.  For more information, contact Hood River County Public Works at 541-386-2616.

 

 

Adblock Detected

We have detected that you are using an adblock in your browser’s plugin to disable advertising from loading on our website.

Your Experience is very important to us, and your Ad Blocker enabled will cause our site not to perform as expected.  Turn off the Ad Blocker or add our site to your exceptions.  After you turn off or add exception please refresh the site or click ok.

Please note: Clicking OK below will NOT disable your ad blocker. You will need to make that change within the ad blocker's settings.