Paving Project On River Road In The Dalles

Starting Wednesday and continuing through Friday, Underground Specialties will be paving along River Road in The Dalles between Crates Way and River Trail Way.  Traffic will be down to one lane between 5:00 a.m. to 6:00 p.m. all three days, and motorists should expect delays.  Motorists are asked to observe all traffic control measures.

Adblock Detected

We have detected that you are using an adblock in your browser’s plugin to disable advertising from loading on our website.

Your Experience is very important to us, and your Ad Blocker enabled will cause our site not to perform as expected.  Turn off the Ad Blocker or add our site to your exceptions.  After you turn off or add exception please refresh the site or click ok.

Please note: Clicking OK below will NOT disable your ad blocker. You will need to make that change within the ad blocker's settings.