Port of HR Nearing Decision On Bridge Claim

The Port of Hood River is becoming more convinced it can make a connection between a boat striking an Interstate Bridge pier last fall and damage to the socket slip and cable for the lift span.  The Port continues to discuss the matter with their insurance company.  Port Executive Director Michael McElwee says with the cost of the needed repairs to the lift span, having it covered by insurance would save the Port quite a bit of money.  He thinks a decision on whether they have a defensible claim will come in a month to six weeks.  The Port’s insurance policy on the bridge does have a $250,000 deductible.  

Adblock Detected

We have detected that you are using an adblock in your browser’s plugin to disable advertising from loading on our website.

Your Experience is very important to us, and your Ad Blocker enabled will cause our site not to perform as expected.  Turn off the Ad Blocker or add our site to your exceptions.  After you turn off or add exception please refresh the site or click ok.

Please note: Clicking OK below will NOT disable your ad blocker. You will need to make that change within the ad blocker's settings.