SR 141 Water Main Work Stopped To Develop Better Traffic Plan

The Washington State Department of Transportation temporarily halted work on a water transmission main project in White Salmon after construction activity on Wednesday led to traffic delays on SR 141 exceeding what the City of White Salmon called “acceptable limits.”  In a statement, the City says construction will resume on Monday after municipal staff, the project contractor, and state transportation officials met to develop a plan to better manage traffic.  When work resumes, the City says traffic delays will be limited to a maximum of 15 minutes, school buses and emergency vehicles will be prioritized to ensure minimal disruption, and work hours will start earlier to restore normal traffic flow by late afternoon.  The City is anticipating a full roadway closure and detour along SR 141 beginning as early as the week of April 20, pending final approval from the state transportation department.  That is expected to provide more predictable travel times that escorted pilot detours during that phase of work.

Adblock Detected

We have detected that you are using an adblock in your browser’s plugin to disable advertising from loading on our website.

Your Experience is very important to us, and your Ad Blocker enabled will cause our site not to perform as expected.  Turn off the Ad Blocker or add our site to your exceptions.  After you turn off or add exception please refresh the site or click ok.

Please note: Clicking OK below will NOT disable your ad blocker. You will need to make that change within the ad blocker's settings.