Port of HR Bridge Delays Over Next Two Weeks

There will be delays on the Port of Hood River Interstate Bridge this week and next, as welding work on the bridge deck takes place.  Single lane closures will take place on weekdays from 8 a.m. to 3 p.m. for the next two weeks.  Port Executive Director Kevin Greenwood says it is important to allow the welders the space to do their work.  Flaggers will direct traffic.  Please drive slowly through the narrow lanes, avoid looking at the welding arc, and allow extra time for your trip.

Adblock Detected

We have detected that you are using an adblock in your browser’s plugin to disable advertising from loading on our website.

Your Experience is very important to us, and your Ad Blocker enabled will cause our site not to perform as expected.  Turn off the Ad Blocker or add our site to your exceptions.  After you turn off or add exception please refresh the site or click ok.

Please note: Clicking OK below will NOT disable your ad blocker. You will need to make that change within the ad blocker's settings.