Crack Sealing In The Dalles This Week

A contractor will be crack sealing some streets in The Dalles beginning today and continuing throughout the week.  Portions of Brewery Grade, West 10th, East 10th, East 12th, and Thompson Street will be the locations of the work.  Work will begin at 7 a.m. each day, and no parking signs will be placed at those locations at least 48 hours before the location is scheduled for sealing.  The crack seal projects will require short-duration single-lane closures for the protection of workers and to allow time for the seal to set.  Motorists are asked to watch for crews and avoid driving on the rubberized asphalt crack seal until it is set.

Adblock Detected

We have detected that you are using an adblock in your browser’s plugin to disable advertising from loading on our website.

Your Experience is very important to us, and your Ad Blocker enabled will cause our site not to perform as expected.  Turn off the Ad Blocker or add our site to your exceptions.  After you turn off or add exception please refresh the site or click ok.

Please note: Clicking OK below will NOT disable your ad blocker. You will need to make that change within the ad blocker's settings.