Transportation & Infrastructure First For Lot 1

The Port of Hood River is planning on dealing with transportation needs and infrastructure for the vacant 11-acre Lot 1 on the eastern portion of the Waterfront before deciding on what that land will actually be used for.  A roundabout at 2nd and Riverside adjacent to Lot 1 is being considered as a way to deal with the kind of expected traffic that Port Commissioner Ben Sheppard notes is supposed to arrive by the end of the decade. Sheppard notes they already have some grant money for engineering, but the Port will be going out for more grants to do construction.

Adblock Detected

We have detected that you are using an adblock in your browser’s plugin to disable advertising from loading on our website.

Your Experience is very important to us, and your Ad Blocker enabled will cause our site not to perform as expected.  Turn off the Ad Blocker or add our site to your exceptions.  After you turn off or add exception please refresh the site or click ok.

Please note: Clicking OK below will NOT disable your ad blocker. You will need to make that change within the ad blocker's settings.