Stormwater Basin Cleaning Planned

The Dalles Public Works crews next week will be cleaning storm water catch basins in the downtown area.  Cleaning catch basins allows for fast drainage into the storm water conveyance system.  Crews are scheduled to work on First, Second, Third and Fourth Streets from the west side of Lincoln Street to the east side roundabout.  Work will occur between 9:00 p.m. and 5:30 a.m. each night, to cause the least disruption to traffic and businesses.  Public Works asks motorists to park so that the catch basins are accessible during the night work hours.  Temporary traffic controls will not be used during these low traffic hours.  Stay well clear of the vacuum truck when the truck lights are flashing.  W. 6th Street from Cherry Heights Road through W 3rd Place are scheduled to be cleaned shortly after 7:00 a.m., with traffic controls, during the same week.

Adblock Detected

We have detected that you are using an adblock in your browser’s plugin to disable advertising from loading on our website.

Your Experience is very important to us, and your Ad Blocker enabled will cause our site not to perform as expected.  Turn off the Ad Blocker or add our site to your exceptions.  After you turn off or add exception please refresh the site or click ok.

Please note: Clicking OK below will NOT disable your ad blocker. You will need to make that change within the ad blocker's settings.