Overnight HR Bridge Closures Start Tuesday

The Hood River-White Salmon Interstate bridge will be closed to all traffic Sundays through Thursdays from 9:00 p.m. to 5:00 a.m., and on Fridays from 12:00 a.m. to 5:00 a.m. beginning tomorrow through July 7. During the closures, crews will perform repairs to the steel truss members of the bridge, including connection repairs, floorbeam knee brace repairs, rocker bearing modifications, debris removal, joint header repair, and sealing concrete cracks.   Port of Hood River Executive Director Kevin Greenwood acknowledged the closure inconveniences a number of people, but he adds there is no ideal time to get the work done, and it needs to be done in good weather.  On the 4th of July, the closure will end at 5:00 a.m. and will not resume until July 5 at 9:00 p.m.

Adblock Detected

We have detected that you are using an adblock in your browser’s plugin to disable advertising from loading on our website.

Your Experience is very important to us, and your Ad Blocker enabled will cause our site not to perform as expected.  Turn off the Ad Blocker or add our site to your exceptions.  After you turn off or add exception please refresh the site or click ok.

Please note: Clicking OK below will NOT disable your ad blocker. You will need to make that change within the ad blocker's settings.