Port Of Cascade Locks & ACL Reach Deal For New Docks

The Port of Cascade Locks announced Tuesday a deal with American Cruise Lines to construct two new docks at the Cascade Locks Marina Park to provide a new landing for the Sternwheeler Columbia Gorge and ACL’s fleet of cruise ships operating in the Columbia River system.  The multi-million-dollar project will be engineered and built by the company and will belong to the Port at the end of the 20-year lease. ACL will also make investments in the Marine area to improve access for cruise ship and Sternwheeler passengers and enhance the waterfront experience.  Next steps will involve completing design and engineering and seeking a permit from the Army Corp of Engineers.  The contract will allow the Port to regain control over the Sternwheeler Cafe and Visitors Center building.  Port officials say they are working to bring what it calls a “highly regarded” full-service restaurant to that location.  ACL and the Port are engaged in conversations about the operations of the Sternwheeler.  The vessel recently completed a required drydocking for scheduled maintenance, and a complete repowering is underway with new, cleaner operating engines.  The Port says it is committed to offering Gorge excursions on the sternwheeler this season.

Adblock Detected

We have detected that you are using an adblock in your browser’s plugin to disable advertising from loading on our website.

Your Experience is very important to us, and your Ad Blocker enabled will cause our site not to perform as expected.  Turn off the Ad Blocker or add our site to your exceptions.  After you turn off or add exception please refresh the site or click ok.

Please note: Clicking OK below will NOT disable your ad blocker. You will need to make that change within the ad blocker's settings.