HR Bridge Lift Span Tests Planned For Monday

Operational testing of the lift span of the Hood River-White Salmon Interstate Bridge is scheduled for Monday, and it may lead to some traffic delays.  Port of Hood River officials say four to six full lifts of the center span will take place on Monday after 9 a.m.  Each lift takes about 15 minutes.  Traffic control will be provided and efforts will be made to minimize the disruption to traffic flow.  But commuters are warned they may want to allow extra time for crossing the bridge on Monday.  Those with questions can call the Port of Hood River at 541-386-1645.

Adblock Detected

We have detected that you are using an adblock in your browser’s plugin to disable advertising from loading on our website.

Your Experience is very important to us, and your Ad Blocker enabled will cause our site not to perform as expected.  Turn off the Ad Blocker or add our site to your exceptions.  After you turn off or add exception please refresh the site or click ok.

Please note: Clicking OK below will NOT disable your ad blocker. You will need to make that change within the ad blocker's settings.